A Security Boom was installed at the cooling intake of the Nuclear Power plant at Gentilly.
Design, fabrication and deployment of an ice boom to protect the Hull 2 and E.B. Eddy hydroelectric power plants’ intakes from ice.
Design and fabrication of an ice boom deployed to replace an existing ice boom to act as safety boom and protect a power generating station downstream.
Ice and safety booms on the Nelson River, Northern Manitoba for the Keeyask Project.
Design, fabrication and deployment of an ice boom to reduce the amount of ice generated in the Rideau River.
Multiple ice-resistant debris and safety booms designed and installed as part of the Eastmain project in Quebec for the James Bay Corporation (Hydro Quebec).
In 2011, an Ice Boom was designed, and deployed upstream of the Jenpeg Hydroelectric Generating Station (GS) located 525km north of Winnipeg, on the Upper Nelson River.
This project consisted of the design, fabrication and installation of a safety boom upstream from a weir in downtown Arnprior, Ontario.