Projects

Waterway Barriers - examples and case studies by industry.

Providing turnkey waterway barriers and other ice engineering solutions in the following industries for over 45 years.

An ice-resistant all season Debris Boom installed in front of Credit Valley Conservation's Island Lake Dam, near Mississauga Ontario.

Read More...

Cylindrical steel pontoons were used to create ice resistent safety booms, one 23km long, replacing the previous booms that did not provide enough resistance to the frazil ice at Hydro Québec's Beauharnois Generating Station

Read More...

Installation of a Safety Boom upstream of Whitehorse Dam, in Schwatka Lake, Yukon.

Read More...

A ship retainer system was designed, and built upstream of the recently constructed A30 bridge at Beauharnois, Quebec.

Read More...

The project consists of the design and supply of all components for a debris boom. The boom is to be installed upstream the canal of Arrow Lake Power Plant.

Read More...

Two Debris Booms were designed, and constructed in James Bay on the Rupert River upstream of a spillway and a 2.9 km long Transfer Tunnel on the Lemare River.

Read More...

Design of a diversion boom on the Ottawa River to protect the Lemieux Island water intake from Frazil.

Read More...

In 2005, an Ice Boom was designed and deployed at the outlet canal of the Gentilly Nuclear Power Station. The purpose of the Ice Boom is to prevent the ice drifts from being blown into the outlet channel, in order to prevent the accidental crushing of fish by floating ice drifts.

Read More...

Contact Us

Give us a call or email to discuss our products and services. Our engineers are available to discuss your new and existing projects.