Consulting Industry

Design, manufacturing, installation or maintenance services.

Ice Control

Minimize frazil ice production causing operational problems at the spillway, tunnels, penstocks and intake blockages.

Debris Management

Protect structures from debris, especially during flooding, with permanent booms capable of resisting ice.

Public Safety

Keep people away from dangerous waters with booms that are resistant to ice, debris and heavy flow.

Projects

A few of the solutions we've delivered to the hydro/power generation industry.

Ice Boom Niagara Falls

Assessment, monitoring, concept design and final design testing of the prototype.

Debris Boom in Sweden

Design of three options to retain debris and prevent entrance into the spillways of the Halvfari Hydro Power Plant.

Ice Boom Jonquiere

Design of an Ice Boom to be deployed upstream of the Chute à Caron Dam and Generating Station.

Bark Lake All Season Safety Boom

In summer of 2006, an All-Season Safety Boom was designed, and constructed upstream of Ontario Power Generation's Bark Lake control dam located on the Madawaska River near Barry's Bay, Ontario.

Tailrace Safety Boom at Chats Falls GS

Past attempts have been made at installing a safety boom across the tailrace channel at Chats Falls GS without much success.

Debris Booms In Arrow Lake

The project consists of the design and supply of all components for a debris boom. The boom is to be installed upstream the canal of Arrow Lake Power Plant.

Debris Booms in James Bay

Two Debris Booms were designed, and constructed in James Bay on the Rupert River upstream of a spillway and a 2.9 km long Transfer Tunnel on the Lemare River.

Diversion Boom in the Ottawa River

Design of a diversion boom on the Ottawa River to protect the Lemieux Island water intake from Frazil.

Contact Us

Give us a call or email to discuss our products and services. Our engineers are available to discuss your new and existing projects.