Three Booms, and ten Hazard Buoys designed for use in fast moving waters were constructed and deployed for Ontario Power Generation in St. Catherines, Ontario.
Design and supply of components for two permanent safety booms at the reservoirs of the Chenaux and Stuartville generating stations.
New pontoon and buoy designed to replace a boom designed and built by the US Corp of Engineers in 1984.
Two permanent Debris Booms were designed, constructed and deployed for Hydro Quebec’s La Romaine-2 Project, located 70 km north of Havre St. Pierre, Quebec.
Design and supply of all components for booms and buoys placed in several locations in Northern Ontario.
The project consists of the design and supply of all components for two safety booms. The booms were installed at the reservoir of Pine Portage and the other in the reservoir of Hay.
This project consisted of the design, fabrication and installation of three safety booms deployed at Calabogie Lake. The booms were designed to resist ice forces.
Past attempts have been made at installing a safety boom across the tailrace channel at Chats Falls GS without much success.