In 2005, an Ice Boom was designed and deployed at the outlet canal of the Gentilly Nuclear Power Station. The purpose of the Ice Boom is to prevent the ice drifts from being blown into the outlet channel, in order to prevent the accidental crushing of fish by floating ice drifts.